移機操作步驟
移機操作步驟
Operation steps of relocation
在空調器安裝中,有很多時候是移拆舊機異地安裝??照{器的移機安裝與新機第一次安裝, 在步驟上略有不同,其步驟如下:
In the installation of air conditioners, the old machines are often removed and installed in different places. The moving installation of the air conditioner is slightly different from the first installation of the new one, and the steps are as follows:
1. 開機檢查空調器制冷、制熱、送風等運行狀態,確認效果良好是否正常。
1. Start up and check the operation status of refrigeration, heating and air supply of the air conditioner to confirm whether the effect is good and normal.
2. 確認效果良好后,進行收氟操作,然后斷掉電源。
2. After confirming that the effect is good, carry out fluorine collection operation, and then cut off the power supply.
3. 拆下室內、外機電源線、信號線和連接管。注意保持連接管接口的清潔,并用膠帶包裹好接頭螺母和喇叭口。
3. Remove the power lines, signal lines and connecting pipes of indoor and outdoor units. Pay attention to keep the connecting pipe interface clean, and wrap the joint nut and bell mouth with adhesive tape.
4. 撬開過墻孔,將連接管、電源線、信號線和排水管抽出。抽管方向要合理,保證不損壞連接管,并將連接管、電源線、信號線和排水管分開,然后彎管收攏。
4. Pry through the wall hole and pull out the connecting pipe, power line, signal line and drainage pipe. The direction of pipe drawing shall be reasonable to ensure that the connecting pipe is not damaged, and the connecting pipe, power line, signal line and drainage pipe shall be separated, and then the elbow shall be closed.
5. 從安裝板上取下室內機,然后拆下安裝板。取室內機時,應保持室內機右端稍高,讓冷凝水從另一端流出室外。
5. Remove the indoor unit from the mounting plate, and then remove the mounting plate. When taking the indoor unit, keep the right end of the indoor unit slightly higher and let the condensate flow out of the room from the other end.